Brgy. Camancijan

Waste & sanitation masterplan — Culasi, Antique, Philippines. Full briefing for Barangay Capitana and Sangguniang Barangay.

In progress Philippines · Antique · Culasi · Bacong River

Author: Marián Kapitán · Version: 1.1 · July 2026
Purpose: Briefing pack for the Punong Barangay (Capitan) and Sangguniang Barangay (Kagawad).

Camancijan (~2,000 residents) needs a dual track: community wastewater (DEWATS) and a zero-waste alternative to open burning (pagsunog). This page carries the full masterplan content in English; the original Slovak PDF remains the document for council sessions.

1. Barangay finance & investment options

Under the Local Government Code of 1991, the barangay is the smallest LGU with its own budget. Camancijan does not hold large capital, but it has legally guaranteed revenues.

1.1 Revenue sources

SourceDescription
NTA (former IRA)Main income — share of national taxes by population and land area
RPT 25%Share of real property tax collected on barangay territory
Own feesBarangay Clearance, hall rental, sari-sari fees
External grantsMunicipality of Culasi, Province of Antique, Congressional Funds

1.2 Mandatory budget funds

1.3 What the barangay may invest in

Funds cannot be invested in stocks or speculative assets. “Investment” means capital spending on local development:

1.4 Powers of the Punong Barangay (Capitan)

The Capitan does not decide major investments alone. Every significant financial decision is approved by the Sangguniang Barangay (7 Kagawad + SK). The Capitan may operationally use the 5% emergency fund and small operating purchases. Large projects (Mega Dike, municipal sewerage) are funded by DPWH / province / municipality — the Capitan lobbies through a Resolution.

2. Wastewater — community septic (DEWATS)

2.1 Septic reality in Camancijan

Local “septics” (imburnal / dry wells of hollow blocks without a floor) act as soakaways. Kitchen greywater often discharges onto the lot. Wells (poso) often are not at the legally recommended distance of ≥ 15 m → drinking-water contamination (E. coli).

2.2 Why the barangay cannot build a full sewer alone

A complete network + treatment plant costs millions of PHP. Camancijan’s annual budget is in the hundreds of thousands to low millions of PHP; the Development Fund is only a fraction. Responsibility split:

2.3 What the barangay can do

  1. Storm drainage canals from the 20% DF — not sewage
  2. Resolution to the Mayor of Culasi / Governor of Antique / congressman
  3. Ordinance — mandatory septics + BHW/Tanod inspections
  4. Barangay Clearance conditioned on a three-chamber sealed septic
  5. Pilot: shared street septic (cluster / DEWATS)

2.4 Pilot — Purok 3 (proposed scope)

ParameterValue
Street length~150 m (Purok 3)
Homes / families / people12 / 15 / ~75
Daily flow~5 m³/day (100 L/person)
Septic volumemin. 15–18.75 m³ (3-day HRT)
Design3-chamber reinforced concrete (50% / 25% / 25%)
Estimate (network + septic + sludge drying)₱43,500 – ₱196,400 by scope

~₱189,500–196,400 covers a full network + septic for ~10–12 homes including skilled labour. The lower ₱43,500 line in the masterplan is the material core / pilot without full labour — always pin the exact street before approval.

2.5 Fecal sludge handling

Every 12–18 months: desludging → Sludge Drying Bed (UV + drying) → co-composting with biochar at the vermi station → safe fertilizer for non-food crops / trees.

3. Solid & bio-waste — instead of illegal burning (pagsunog)

RA 9003 and RA 8749 ban open burning, yet it persists in the field. Burning palay, palm fronds, corn cobs and bunot produces:

Response: three zero-waste pillars plus BHW education (children’s and elders’ health outweighs paper laws alone).

3.1 Pillar 1 — Dry biomass: shredder + biochar (TLUD)

InputCoconut fronds, bunot, branches, corn cobs
TechnologyMobile shredder 7.5 HP + 2× TLUD drum reactors
OutputBiochar to soil (water + nutrients)
CostShredder ₱29,180 + TLUD ₱5,600 = ₱34,780

3.2 Pillar 2 — Soft organics: vermicompost

InputKitchen waste, soft leaves, (after drying) septic sludge
Technology3 concrete bins at the MRF + African Nightcrawler
OutputVermicast (organic fertilizer)
Cost₱15,950

3.3 Pillar 3 — Animal waste: tubular biogas

InputPig/poultry manure + kitchen waste
TechnologyPE tube 10 m, manometer, low-pressure stove
OutputCooking gas + digestate; −90% odour
Cost₱9,775 (1 pilot household)

3.4 Supplementary methods

4. Masterplan CapEx summary

ItemPHP
Mobile shredder29,180
Biochar TLUD (2 units)5,600
Vermicompost station15,950
Pilot biogas9,775
DEWATS + sludge drying (pilot)43,500
Total (base masterplan)104,005
Option: full street septic for 12 homes+ ~150,000–190,000

Financing mix: 20% Development Fund + LGU Culasi / province + Bayanihan + a symbolic maintenance fee (e.g. ₱30/month for desludging).

5. Implementation (3 months)

Month 1

Council approval; shredder purchase; DEWATS excavation; vermi concrete; TLUD welding.

Month 2

MRF training; biogas pilot; household connections; sludge drying bed.

Month 3

Regular bio-waste collection; first biochar/vermicast batch; DEWATS effluent check; present to Culasi.

6. Call to action

Approve at the next Barangay Council session:

  1. Ordinance — ban on pagsunog + mandatory connection to the Purok 3 cluster septic pilot
  2. AIP / budget — start the dual-system biochar + shredder (₱34,780) as the fastest anti-smoke intervention
  3. Resolution — request DEWATS co-financing from LGU Culasi / Antique

Join forces for a cleaner, healthier, and more modern Camancijan.